Integration of 3x 4.2MW turbines into the national grid including:
33kV switchgear (CBGS-0 & GHA by Schneider)
100kVA auxiliary transformer (33kV/433V) with LV distribution
Battery chargers (110V DC & 48V DC), telecoms, and RTU
Earthing and trench ducting
SCADA and protection panels
MES Power Engineering coordinated with SPEN and ENERCON to deliver:
Substation and auxiliary systems built to compliance standards
Optimised cable routing and trench layout to reduce civil works
HVAC and UPS spaces for future expansion and flexibility
Fully compliant integration to SPEN and ENERCON specifications
Technically robust substation ready for future upgrades
Safe and reliable connection enabling renewable energy generation