Design, procurement, and construction of:
33kV primary substation
1.3 km off-site HV cable route
Grid interface with SSE (DNO) including Point of Connection (POC)
50kVA auxiliary transformer and fenced compound
Integration of control panels, metering, SCADA, and safety interlocks
MES Power Engineering acted as Principal Contractor and Principal Designer under CDM Regulations 2015.
Full design & build responsibility for HV substation, civil works, GRP housing, and auxiliary systems
Off-site HV cable trenching, jointing, backfilling, and reinstatement to DNO standards
Design approvals in accordance with SSEN standards
Compliance with CDM regulations including risk assessments and hazard interface plans