Brackenhills 33kV Connection

Project Scope

Design, procurement, and construction of:

  • 33kV primary substation

  • 1.3 km off-site HV cable route

  • Grid interface with SSE (DNO) including Point of Connection (POC)

  • 50kVA auxiliary transformer and fenced compound

  • Integration of control panels, metering, SCADA, and safety interlocks

Our Solution

MES Power Engineering acted as Principal Contractor and Principal Designer under CDM Regulations 2015.

  • Full design & build responsibility for HV substation, civil works, GRP housing, and auxiliary systems

  • Off-site HV cable trenching, jointing, backfilling, and reinstatement to DNO standards

  • Design approvals in accordance with SSEN standards

  • Compliance with CDM regulations including risk assessments and hazard interface plans

Benefits to Our Client

  • Zero RIDDOR incidents (independently audited HSE compliance)
  • Programme shortened by three weeks using prefabricated plinths and GRP enclosures
  • Future-proofed installation with cable marker tile system and custom auxiliary transformer fencing